Close
Reserve
Check In
#
Check Out
#
Room(s)
Adults Per Room

Sheraton Grand Hotel & Spa, Edinburgh

1 Festival Square · Edinburgh EH3 9SR · United Kingdom ·
Phone: (44)(131) 229 9131
Local Time: 10:47 PM · Weather: Partly Cloudy, 13 °C · E-Mail Us · Live Webcam · Announcements · Careers
Sheraton-Edinburgh-Hotel-Scotland-Renovation-01
Book Now

Getting better all the time

The Sheraton Edinburgh has embarked on a  multi-million pound full bedroom refurbishment. Every room in the hotel will be completely transformed into something really rather special. With a whole new look and a whole new feel, each new room features natural materials, simple colours and soft fabrics. It’s warm, welcoming and contemporary.

Time and space

With its clever use of glass and reflective surfaces, the rooms are open and spacious, with an easy flow between the bedroom and a bathroom encapsulated in glass. Warm, honeyed stone sweeps over the bathroom walls, interrupted only by a transparent partition between bath and walk-in shower.

Seeing is believing

Naturally, we've included everything the modern traveller needs, including an amazing new media hub that allows you to connect your own MP3 player, laptop, mobile phone, camera and games console with the 37inch in-room TV. On-demand television and both cable and wireless internet access will keep you connected with the world outside.

We've thought long and hard about these new bedrooms. But we've never lost sight of the main aim: to create a room where you feel relaxed, rejuvenated and ready for whatever the day brings.

Come and see our new rooms for yourself from May 2010.

Bedroom features

• Air-conditioning, controlled in-room
• Enhanced mood lighting
• Separate bath, walk-in power shower and toilet cubicle in all bathrooms
• 37inch interactive television
• Media Hub
• Cable and wireless internet access
• International power supply
• Laptop Safe
• Mini-bar
• Tea and coffee making facilities

The work is being undertaken in two phases, in two separate wings of the hotel ensuring minimal disruption to guests. The refurbishment is scheduled to be completed by September 2010.